Thursday, April 22, 2021
  • About
  • Privacy Policy
  • Contact
Zim24News
  • Home
  • News
  • World
  • Politics
  • Business
  • Tech
  • Sports
  • Health
  • Entertainment
No Result
View All Result
  • Home
  • News
  • World
  • Politics
  • Business
  • Tech
  • Sports
  • Health
  • Entertainment
No Result
View All Result
Zim24News
No Result
View All Result
Home Business

Lithium mine targets exports by December

Zim24 News by Zim24 News
April 8, 2021
in Business
0
Lithium mine targets exports by December
0
SHARES
0
VIEWS
Share on FacebookShare on TwitterShare on Whtsapp

The Herald
Business Reporter
Prospect Resources PLC, developer of the Arcadia lithium project near Harare, intends to commence lithium sample shipments in the second half of this year, when it completes an accelerated staged development plan for the fledgling lithium initiative.
Lithium is an integral element of the Government’s target of building a US$12 billion mining industry by 2023 with lithium shipments anticipated to top half a billion United State dollars by then.
Mining is one of Zimbabwe’s largest foreign currency earners and it generates nearly three quarters of the country’s annual foreign currency receipts.
Following the strategy to assess a staged development plan of 1,2 million tonnes per annum (Mtpa) to 2,4Mpta, Prospect said it was moving swiftly to begin an optimised feasibility study for Arcadia lithium project.
Prospect said the strategic view had recommended construction of a smaller, commercial-scale petalite pilot plant at the Arcadia Lithium Mine.
At Arcadia, Prospect has huge deposits of both technical grade (petalite) and chemical grade (spodumene) lithium, but wants to rapidly progress the technical grade lithium through a low risk, low cost near-term production under the staged development plan.
Prospect said it had appointed Perth based engineering consulting group, Lycopodium to lead and complete the Feasibility Study.
The Australian company was deemed a good fit given its past relationship with Prospect and the Arcadia project, as well as being a leader in designing, costing process plants and implementing projects across a wide range of commodities, including lithium.
Prospect’s managing director Sam Hosack said: “We believe that Lycopodium is the perfect partner for Prospect to align with on the Arcadia Project.
“Their broad capabilities, technical rigour, team of highly skilled engineers and designers, and track record in Australia, Africa and Zimbabwe provide a highly valuable service offering to Prospect Resources.
“We are very pleased with the progress that the Company is making towards delivering on its plan to build and operate a pilot plant to rapidly move Arcadia through optimised feasibility and into development.
“Prospect is determined to deliver on a clear development pathway in as short a timeframe as possible, whilst still ensuring that the technical and economic risks are fully understood and addressed.”
Lycopodium’s primary Scope of Work is the supervision of metallurgical test work, optimisation of the staged 1.2 Mtpa to 2.4 Mtpa flowsheet, design for the process plant, as well as related infrastructure including site power reticulation and on-site water treatment and distribution, Prospect said in recent a statement.
Mr Hosack said that the staged development plan reduced time to production by leveraging lower capital expenditure and funding requirements and also enabled clear expansion in line with market growth.
“This development strategy allows project execution and market integration risks to be minimised whilst accelerating the pathway to first cash flow.
“Critically, Prospect maintains the ability to go direct to a plant capacity of 2.4Mtpa should market conditions and funding activities allow. We look forward to providing regular market updates on the progress of the Optimised Feasibility Study over the coming months,” he said.
The lithium prospecting company said it believes that the use of a tier one engineering firm for the optimised feasibility study should assist in the process of securing requisite funding for the project.
Prospect will also continue to retain the ability to go direct to plant capacity of 2.4Mtpa, should market conditions and funding activities allow.
Prospect is in discussions with its existing off-take partners and institutional financiers with respect to financing pathways for the staged development of Arcadia.
It is also in early-stage discussions with strategic partners regarding joint development structures.

Credit: Source link

Previous Post

EcoFarmer, Vaya business units team up to support tobacco farmers

Next Post

AstraZeneca blood clot deaths soar to 19

Zim24 News

Zim24 News

Zim24News.com is a Zimbabwe based online News Portal which aims to provide Hot Breaking News on time!

Next Post
AstraZeneca blood clot deaths soar to 19

AstraZeneca blood clot deaths soar to 19

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Trending
  • Comments
  • Latest
RTG, Cresta refurbish hotels | The Herald

RTG, Cresta refurbish hotels | The Herald

April 22, 2021
Zimbabwe: Makore’s Debut Is Just What the Spirits Ordered

Zimbabwe: Qounfuzed, Cindy Partners in ‘Crime’

April 22, 2021
How to get ZIMSEC A-Level results online

How to get ZIMSEC A-Level results online

April 22, 2021

Government hails Simba Bhora project

April 22, 2021
ZIMSEC A-Level results for November 2020 out today

ZIMSEC A-Level results for November 2020 out today

April 22, 2021
ADVERTISEMENT

What's Happening?

NAAZ weighs more options | The Herald

January 8, 2021
UK minister condemns harassment of MDC activists

Diasporans pool resources for detained Zim activists

April 15, 2021
Chinese firm invests US$80m in coke oven

Chinese firm invests US$80m in coke oven

February 17, 2021
Zimbo designs working quadbike from scrap metal

Zimbo designs working quadbike from scrap metal

April 5, 2021

Browse by Category

  • Agriculture
  • Business
  • Entertainment
  • Feature
  • Health
  • Lifestyle
  • Music
  • News
  • Opinion
  • Politics
  • Sports
  • Tech
  • Travel
  • World

What’s New Here?

  • Zimbabwe: Qounfuzed, Cindy Partners in ‘Crime’
  • How to get ZIMSEC A-Level results online
  • Government hails Simba Bhora project

Subscribe to Get More!

Loading

Sponser


  • About
  • Privacy Policy
  • Contact

© 2018 Zim24News.com - Zimbabwe Breaking News and more - Crafted with Love by iFtiDev.

No Result
View All Result
  • Home
  • News
  • World
  • Politics
  • Business
  • Tech
  • Sports
  • Health
  • Entertainment

© 2018 Zim24News.com - Zimbabwe Breaking News and more - Crafted with Love by iFtiDev.